{"id":113,"date":"2021-04-26T16:12:29","date_gmt":"2021-04-26T13:12:29","guid":{"rendered":"http:\/\/radarmedia.ro\/?p=113"},"modified":"2021-04-26T16:12:29","modified_gmt":"2021-04-26T13:12:29","slug":"drumul-expres-craiova-targu-jiu-va-avea-sase-variante-de-traseu","status":"publish","type":"post","link":"https:\/\/radarmedia.ro\/index.php\/2021\/04\/26\/drumul-expres-craiova-targu-jiu-va-avea-sase-variante-de-traseu\/","title":{"rendered":"Drumul expres Craiova &#8211; T\u00e2rgu Jiu va avea \u0219ase variante de traseu"},"content":{"rendered":"<p>Drumul expres Craiova &#8211; T\u00e2rgu Jiu nu are \u00eenc\u0103 un traseu stabilit. \u00cen urm\u0103toarea jum\u0103tate de an, se vor stabili \u0219ase posibile trasee, din care se va alege varianta final\u0103.\u00a0<span class=\"pq6dq46d tbxw36s4 knj5qynh kvgmc6g5 ditlmg2l oygrvhab nvdbi5me sf5mxxl7 gl3lb2sf hhz5lgdu\">&#8222;Ordinul de incepere a lucrarilor a fost dat pe 16.04.2021. <\/span>Primul pas este o analiza multicriteriala care dureaza 6 luni si in urma careia vor fi propuse 6 variante. Pasul doi este analiza multicriteriala 2 in care se va decide varianta de traseu finala, intre doua variante ramase in selectie dintre cele 6. Pasul 3 este proiectarea, care va dura 5-6 luni&#8221;, a anun\u021bat deputatul USR, Radu Miru\u021b\u0103, \u00een urma unei \u00eent\u00e2lniri, la sediul Companiei Na\u021bionale de Autostr\u0103zi \u0219i Infrastructur\u0103 Rutier\u0103 (C.N.A.I.R), cu directori din Ministerul Transporturilor \u0219i reprezentan\u021bi din zona Olteniei.<\/p>\n<p>Lucr\u0103rile efective, pentru viitorul drum de vitez\u0103, ce leag\u0103 T\u00e2rgu Jiul de Craiova, nu pot \u00eencepe mai devreme de doi ani. Abia \u00een 2023, este stabilit\u0103 licita\u021bia, dac\u0103 primele etape se desf\u0103\u0219oar\u0103 conform planului \u0219i nu vor fi \u00eent\u00e2rzieri. &#8222;Am stabilit ca: Studiul de fezabilitate sa se termine pana pe 16.06.2022;<\/p>\n<p>Proiectul de autorizare sa se termine pana pe 16.12.2022;<\/p>\n<div dir=\"auto\">Proiectul tehnic sa se finalizeze pana pe 16.12.2022.<\/div>\n<div dir=\"auto\">Mai raman 3.5 luni pentru asistenta tehnica in vederea lansarii licitatiei de executie ce are termen 18.04.2023&#8243;, a mai anun\u021bat Radu Miru\u021b\u0103, dup\u0103 \u00eent\u00e2lnirea cu reprezentan\u021bii din dimeniul transporturilor \u0219i Companiei de Drumuri Na\u021bionale.<\/div>\n","protected":false},"excerpt":{"rendered":"<p class=\"text-justify mb-2\" >Drumul expres Craiova &#8211; T\u00e2rgu Jiu nu are \u00eenc\u0103 un traseu stabilit. \u00cen urm\u0103toarea jum\u0103tate de an, se vor stabili \u0219ase posibile trasee, din care se va alege varianta final\u0103.\u00a0&#8222;Ordinul de incepere a lucrarilor a fost dat pe 16.04.2021. Primul pas este o analiza multicriteriala [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":114,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2,3,4],"tags":[40,39],"class_list":["post-113","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-featured","category-politic","category-ultima-ora","tag-craiova-tg-jiu","tag-drum-expres"],"_links":{"self":[{"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/posts\/113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/comments?post=113"}],"version-history":[{"count":2,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/posts\/113\/revisions"}],"predecessor-version":[{"id":116,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/posts\/113\/revisions\/116"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/media\/114"}],"wp:attachment":[{"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/media?parent=113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/categories?post=113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/radarmedia.ro\/index.php\/wp-json\/wp\/v2\/tags?post=113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}